March 14, 2022
–
Surat Municipal Corporation
Information
Client
Surat Municipal Corporation
PMC
Shyna Consultants PVT LTD. in association with Multi Media Consultants PVT LTD.
Location
Surat - Dumas Main road at Parle Point junction, Surat, Gujart, India
Project costs
590 millions
Time Taken
24.5 Months
Lenght of Bridge
969.75 meters main fly over bridge and 298.00 meters branch fly over bridge Ghoddod road ramp
No. of Spans
23

Salient Features:
- Large diameter bored cast in situ pile foundation
- Precast Post Tention PSC I Girders and
PSC Solid Slab Super Structure - Elastromeric and Pot - PTFE bearing
- Reinforced Earth Wall for Embankment